The v9.60 Winter 26 Release Notes for clearMDM are available on the website along with the latest URL to install the package. This blog post provides a brief summary:
- MDM Status Configuration Page – A new page has been added within the Home tab, which displays the current configuration status of your MDM settings per Target Object. There are four panels showing the Cleanse, Match, Merge and Data Stewardship configuration status. Each panel also provides links to the relevant MDM Settings to make any required changes. It is designed to offer a centralised view of your MDM configuration. Further information can be found in this blog post.
- Data Quality Ruleset – Master Record Priority – The Master Record Priority (first factor), can now be referenced to a Data Quality Ruleset within the Target Object Merge Settings. This allows for the Master Record to be selected based upon a specific Data Quality action, e.g. Address Quality. The second factor can also be determined in the case of a tie, using newest or oldest dates.
- Data Quality Ruleset – Attribute Groups – You can now select a Data Quality Ruleset to be referenced to within an Attribute Group, to determine fields to be populated when the Merge MDM operation performs, based upon the Data Quality Rule. Further information can be found in this Training Article.
- Data Stewardship Rules – A new feature has been added, designed to provide flexible data governance control through evaluation of the duplicate group level conditions. Further information can be found in this blog post.
- Scheduled Job Enhancements – With Winter ’26, you can now schedule jobs with a record limit, specify a sort field and direction, and apply a filter using a chosen field and value. Further information can be found in this blog post.
To find out more about clearMDM, please contact us at hello@clearMDM.com or by using the Contact Us form on the website.